Avem peste 6.000.000 de produse de la magazine si vanzatori profesionisti in Okazii.ro Marketplace
Cos cumparaturi
Favorite
Numar articol: 246784099. Vezi produse asemanatoare.
Pune in vanzare un produs ca acesta

Critical Path

Cost unic de transport la toate comenzile acestui vanzator
Disponibilitate:
In stoc furnizor
Livrare:
  Curier rapid - 12,90 Lei Detalii
Estimat livrare:
Joi, 17 Sep.
Cantitate:
Pret:
180,00 Lei
Primesti 180 puncte in aplicatie
Produs:
Nou, Ofer garanție, Cu factură
Politica de retur:
Acest produs poate fi returnat in 3 zile Detalii
Plata:
  • Ramburs direct la vanzator
  • Avans
  • Online
Publicitate

Vânzatorul este direct răspunzator pentru produsul afișat în această pagină.

Specificatii

Critical Path marks the masterwork of one of the finest minds and most significant thinkers of the modern age R. Buckminster Fuller is regarded as one of the most important figures of the 20th century, renowned for his achievements as an inventor, designer, architect, philosopher, mathematician, and dogged individualist. Perhaps best remembered for the Geodesic Dome and the term Spaceship Earth, his work and his writings have had a profound impact on modern life and thought. Critical Path is Fuller's master work--the summing up of a lifetime's thought and concern--as urgent and relevant as it was upon its first publication in 1981. Critical Path details how humanity found itself in its current situation--at the limits of the planet's natural resources and facing political, economic, environmental, and ethical crises. The crowning achievement of an extraordinary career, Critical Path offers the reader the excitement of understanding the essential dilemmas of our time and how responsible citizens can rise to meet this ultimate challenge to our future.

Modalitati de livrare si plata

LIVRARE

In Bucuresti

  • - Prin Curier rapid - 12.9 Lei in max. 11 zile lucratoare

In Romania:

  • - Prin Curier rapid - 12.9 Lei in max. 11 zile lucratoare

PLATA

  • - Ramburs direct la vanzator
  • - Avans
  • - Online

Politica de retur

  • - Produsul se poate returna in maxim 3 zile lucratoare
  • - Metoda de retur: Ramburs contravaloare produs
  • - Costul transportului va fi suportat de catre cumparator
  • - Alte detalii: Retur acceptat in conditiile Garantiei de Livrare
Optiunea ta
Critical Path
CUMPARA
Pret curent:
18000 Lei
Comanda minima:
1 bucata
Cantitatea:
Fii primul care scrie un review

Spune-ti parerea acordand o nota produsului